At the beginning of October, 2008, our building was all laid out flat. Up until the 14th, "progress" was a dream that could change everything if it actually happened!





















Less than a month after the big crane arrived and arranged the walls, they are painted and we have a roof. The offices are being framed out, as well as our paint and storage rooms. The garage doors are installed and the electric lines are run with plug-ins everywhere. The sprinkler system is in. The gas lines are run.

There is so much new PROGRESS every day, we have to make sure and get down to Hwy 212 and 135th to catch the latest!!



Woohooo!!!! (Thank You, LORD!!)